TUTORIAL 1.2 - COOKER VALVE

Figure 1 – Component to obtain 

Main goal of the tutorial: To show an example of a process design improvement regarding material saving under the constraints of die filling and press load.

Concerned issues:

  • Material saving
  • Die filling(Although very important, fold detectionissue is excluded from this tutorial for the sake of simplicity. Please refer to the Tutorial 1.6 on this issue)
  • Press load